This was a very full day of work without much dramatic photographic evidence to show for it.
First thing in the morning, I went out to the garage and started inspecting and tightening the stitches we put into the hull yesterday. Then I found some straight sticks of lumber to lay crosswise in order to check the hull for any undesired twist. It came out perfectly.
About 9:30 our friends Terry and Kathy came over so that Terry could help me flip the boat over bottom-side-up.
After we visited for a while, I got back to work by laying out the spars and the rails so that I could glue them together in case I had some extra glue later on in the day. I also spent a happy hour or so cutting another 25 PVC clamps so that I would have 60+ clamps on hand when it comes time to glue on the rails.
Finally, I got down to mixing up pastry bags of thickened epoxy glue. With the first bag I glued the lowermost hull panel to the bottom. I used the remnant of that bag to glue together the spars and parts of the rails.
After lunch I mixed three sequential pastry bags and glued all the hull panels on the starboard side of the boat as well as part of one panel on the port side. I should be able to finish up tomorrow morning. This whole pastry bag business is very nerve-wracking. I don't have steady hands in the best of circumstances (and would have made the world's worst surgeon), but this job really got to me. I've used fiberglass often enough in the past to know what a mess it can be to clean up. Trying to drip a bead of fiberglass into all these narrow cracks studded with lots of sharp copper wires always trying to rip the bag or snag my Latex gloves or slice my tender flesh (and make me bleed all over the expensive Okoume plywood) put me into a trembling terror. As a result my bead wandered way too much.
I did get the job done and subsequently resigned myself to the laborious task of cleaning up all the drips. The outcome is probably going to be fine.
After dinner Sue and I both went into the garage to snip all the wire stitches that I have already glued so that we could pull them while they were still tacky and clean up the little gobs of still-sticky epoxy that tended to gather around the stitches. My theory is that the stitches are no longer necessary as long as I allow sufficient time for these "welds" to harden before flipping the boat over again. Time will tell.
This blog records various activities that my wife and I enjoy within one day's drive of our cabin on Lake Norfork in the Arkansas Ozarks. Of course, many of these activities take place right on the lake outside our window, so the earliest entry begins with a little factual information (culled from various web sites) about the lake and its history.
Thursday, October 8, 2015
Wednesday, October 7, 2015
Building a Chesapeake Light Craft Northeaster Dory -- Day 6
This is the day when the Dory started to look like a Dory. I went to town in the morning, but in the afternoon Sue and I spent three hours stitching on the rest of the hull panels. I had to wrestle with the fitting of the transom and drill a few new holes for the stitches, but to my untutored eye everything is turning out quite well.
Tomorrow I will need to tighten many of the stitches and then find a way to flip the boat so that I can begin spot gluing the hull panels between stitches. That will firm up the hull, allowing me to flip it again and fiberglass the interior of the hull.
If I have to kill time before I can recruit a helper to flip the boat, I still need to glue up the rails, the spars, the daggerboard, and the rudder.
Tomorrow I will need to tighten many of the stitches and then find a way to flip the boat so that I can begin spot gluing the hull panels between stitches. That will firm up the hull, allowing me to flip it again and fiberglass the interior of the hull.
If I have to kill time before I can recruit a helper to flip the boat, I still need to glue up the rails, the spars, the daggerboard, and the rudder.
![]() |
| Looking at the Dory from the bow |
![]() |
| Looking at the Dory from the transom |
![]() |
| Closer view of the bow |
![]() |
| Closer view of the transom |
Tuesday, October 6, 2015
Building a Chesapeake Light Craft Northeaster Dory - Day 5
Last night I told Sue that she would soon have to join me as a boat builder for a day or two. She was eager to start! (The alternative was that she would have to work toward her goal of riding 100 miles a week on her bike.) So in the morning while she went to town, I sanded the thwarts and cleaned up all rabbets and splotches on the hull panels. Then I cleaned off the flatbed trailer and dragged it outside to make room in the garage for the two saw horses that will hold the boat during the rest of the construction.
We got down to work in mid-afternoon and started to wire on the first hull panels and the bulkheads. It was a touchy and somewhat challenging business -- especially the final task of fitting in the transom. But now it is starting to look like a boat. By tomorrow afternoon it should start looking like a Northeaster Dory.
We got down to work in mid-afternoon and started to wire on the first hull panels and the bulkheads. It was a touchy and somewhat challenging business -- especially the final task of fitting in the transom. But now it is starting to look like a boat. By tomorrow afternoon it should start looking like a Northeaster Dory.
Monday, October 5, 2015
Building a Chesapeake Light Craft Northeaster Dory -- Day 4
This morning I spent a couple of hours cleaning up the hull panels I glued yesterday and then preparing for the afternoon by attaching rails to the flatbed so that I could later glue and clamp the thwarts.
After lunch it took another couple of hours to glue and clamp the 4th hull panel as well as the thwarts.
We're now ready to begin assembling the hull whenever Sue and I find a few hours that we can both devote to the task. First, though, I have to at least trace onto cardboard the outlines of the bulkheads so that it is later easier to cut the exact shapes of the foam flotation blocks that will be glued under the thwarts.
And while I await Sue's leisure, I still have a number of other steps I can usefully complete -- gluing the rails, the spars, the rudder, and the daggerboard, as well as beginning to shape the mast.
After lunch it took another couple of hours to glue and clamp the 4th hull panel as well as the thwarts.
We're now ready to begin assembling the hull whenever Sue and I find a few hours that we can both devote to the task. First, though, I have to at least trace onto cardboard the outlines of the bulkheads so that it is later easier to cut the exact shapes of the foam flotation blocks that will be glued under the thwarts.
And while I await Sue's leisure, I still have a number of other steps I can usefully complete -- gluing the rails, the spars, the rudder, and the daggerboard, as well as beginning to shape the mast.
Sunday, October 4, 2015
Building a Chesapeake Light Craft Northeaster Dory -- Day 3
Surprisingly about half of my boat-building time has been spent getting ready to work on the boat -- unpacking parts, moving things around, preparing the flatbed trailer, finding plastic, cutting clamps, etc.
The first hull panels glued together nicely. This morning I removed the clamps and used the new orbital sander to sand the joints smooth. It came close to using up one piece of 80-grit sandpaper so I am definitely going to want some 10-sheet or 20-sheet packets. Then I had to prepare a cardboard covered place on the floor big enough to store the panels for a couple of days. After that I set up panels 2 and 3 for gluing, as well as the mast.
Tomorrow I will still have to glue panel 4 and I can certainly do the thwarts and perhaps the spars and the rails. I think that’s all the use I’ll have for the flatbed trailer. By Tuesday or Wednesday, I’ll be ready to wire together the hull
The first hull panels glued together nicely. This morning I removed the clamps and used the new orbital sander to sand the joints smooth. It came close to using up one piece of 80-grit sandpaper so I am definitely going to want some 10-sheet or 20-sheet packets. Then I had to prepare a cardboard covered place on the floor big enough to store the panels for a couple of days. After that I set up panels 2 and 3 for gluing, as well as the mast.
Tomorrow I will still have to glue panel 4 and I can certainly do the thwarts and perhaps the spars and the rails. I think that’s all the use I’ll have for the flatbed trailer. By Tuesday or Wednesday, I’ll be ready to wire together the hull
Subscribe to:
Posts (Atom)